Recent and Notable Projects
Front Street Sewer Upgrade
Key challenges included:
- Large project, over 40,000 square feet of sheet piling
- Very close to existing train tracks
- Very close to active traffic lanes
West Kamloops Substation, Site Prep for BC HYDRO
Key challenges included:
- Extremely dense material
- Very tight timeline
- Extreme weather, with heat and smoke
Halls Prairie and Panorama Pump Stations
Key challenges included:
- Long 50' sheet piles
- Combination of sheet piling, pipe piling, and timber piles
- Multiple jobsite locations
Hawthorne Care Home Expansion, Port Coquitlam BC
Key challenges included:
- Extremely tight working area
- Close proximity to existing structures
- Tight timeline for completion
Hollybridge and Elmbridge, Richmond BC
Key challenges included:
- Multiple angles and disjointed segments of wall
- Close proximity to high value communication lines
- Close co-ordination with multiple trades
- Minimal traffic disruption
No. 5 and River Rd., Richmond BC
Key challenges included:
- Tight access
- Close proximity to high tension power lines
- Tidal work
Angus Drive, Richmond BC
Key challenges included:
- Large 11m x 13m cofferdam
- Extremely dense till layer
- Complicated fitting on whaler system
RainCity, Coquitlam BC
Key challenges included:
- Long piles up to 115' depth
- Tight working areas
- Leed certified compliance
Blackie Spit, White Rock BC
Key challenges included:
- Combined sheet pile cofferdam and driven pile design
- Environmentally sensitive area
- Tide work
Commercial building, Burnaby BC
Key challenges included:
- 800 piles, 12 3/4" diameter
- Multiple splices
- Close co-ordination with multiple trades
Various indoor work, Burnaby BC
Key challenges included:
- Extremely limited headroom
- Extremely limited access
- Large capacity requirements
SOPA Square, Kelowna BC
Key challenges included:
- Large sheet pile project (400 linear meters and 300 pairs of sheets)
- Large densification pile project (over 800 piles)