• Sheet Piling
    Installing 45 pair of PZC 18 sheet piles
    for Pedre Contracting to safely retain an
    existing box culvert.
  • Sheet Piling
    A unique job located in White Rock BC
    consisting of a sheet pile cofferdam and
    pipe piling to replace an existing pump station
  • Steel Foundation Piling
    Over 800 Steel Pipe Piles up to 85 feet long
    installed in Burnaby BC for Capo Construction
  • Low Headroom Solutions
    Our custom built Link Belt crane can access tight
    locations with a 10' by 10' opening, and can deliver
    impact energies exceeding 30,000 foot pounds for
    maximum capacity in tight access conditions.
  • CWB Certified Welders
    West Coast Pile Driving Ltd. is a Canadian Welding
    Bureau certified company and employs CWB certified
    welders with engineered welding procedures
  • Custom Whaler Installation
    With our many years of combined experience
    fitting and welding, any design can be
    custom tailored to suit the job.
  • Our Mantis 6010
    Our latest asset, the Matis 6010 excels
    in rapid deployment to get projects started
    quickly with minimum set up time. It is also
    useful for tight environments and can pick and
    carry its full rated load of 60,000 lbs.
  • Timber Pile Installation
    Over 800 Timber Densification piles were driven
    on this project in Kelowna, BC along with over
    400 linear metres of temporary Sheet Piling making
    it our largest project to date.
  • Low Headroom Solutions
    With our low access crane, we can easily reach
    under existing awnings or buildings with mimimum
    disturbance or structural modifications. All we require
    is a 10'x10' doorway.

Recent and Notable Projects



Front Street Sewer Upgrade

Key challenges included:

    - Large project, over 40,000 square feet of sheet piling
    - Very close to existing train tracks
    - Very close to active traffic lanes



West Kamloops Substation, Site Prep for BC HYDRO

Key challenges included:

    - Extremely dense material
    - Very tight timeline
    - Extreme weather, with heat and smoke



Halls Prairie and Panorama Pump Stations

Key challenges included:

    - Long 50' sheet piles
    - Combination of sheet piling, pipe piling, and timber piles
    - Multiple jobsite locations



Hawthorne Care Home Expansion, Port Coquitlam BC

Key challenges included:

    - Extremely tight working area
    - Close proximity to existing structures
    - Tight timeline for completion



Hollybridge and Elmbridge, Richmond BC

Key challenges included:

    - Multiple angles and disjointed segments of wall
    - Close proximity to high value communication lines
    - Close co-ordination with multiple trades
    - Minimal traffic disruption



No. 5 and River Rd., Richmond BC

Key challenges included:

    - Tight access
    - Close proximity to high tension power lines
    - Tidal work



Angus Drive, Richmond BC

Key challenges included:

    - Large 11m x 13m cofferdam
    - Extremely dense till layer
    - Complicated fitting on whaler system



RainCity, Coquitlam BC

Key challenges included:

    - Long piles up to 115' depth
    - Tight working areas
    - Leed certified compliance



Blackie Spit, White Rock BC

Key challenges included:

    - Combined sheet pile cofferdam and driven pile design
    - Environmentally sensitive area
    - Tide work



Commercial building, Burnaby BC

Key challenges included:

    - 800 piles, 12 3/4" diameter
    - Multiple splices
    - Close co-ordination with multiple trades



Various indoor work, Burnaby BC

Key challenges included:

    - Extremely limited headroom
    - Extremely limited access
    - Large capacity requirements



SOPA Square, Kelowna BC

Key challenges included:

    - Large sheet pile project (400 linear meters and 300 pairs of sheets)
    - Large densification pile project (over 800 piles)